Pepperl+Fuchs Intrinsic Safety Barriers K-System Solenoid Driver KFD2-SL2-Ex1 arrived.
Time: 2020年04月14日Feature: 1-channel isolated barrier, 24 V DC supply (Power Rail), Output 45 mA at 11.7 V DC, Logic input, non-polarized, Line fault detection (LFD), Up to SIL 2 acc. to IEC 61508.
Function: KFD2-SL2-Ex1
· This isolated barrier is used for intrinsic safety applications.
· The device supplies power to solenoids, LEDs and audible alarms located in a hazardous area.
· It is controlled via logic signals. The inputs have two defined states: 1-Signal = 16 V DC ... 30 V DC, 0-Signal = 0 V DC ... 5 V DC. The current consumption of the input is about 3 mA.
· At full load, 11.7 V at 45 mA is available for the hazardous area application.
· If the field impedance is > 10 kΩ for lead breakage or < 50 Ω for short circuits a line fault is detected.
· A fault is signalized by LEDs and a separate collective error message output.
Associated Products:
KFD2-EB2
KFD2-EB2.R4A.B
UPR-03
UPR-03-S
KFD2-EB2.R4A.B.SP
KFD2-EB2.SP
UPR-03-M
K-DUCT-BU
K-DUCT-BU-UPR-03
- Previous:MEAN WELL EDR-120-24 switching power supply arrived.
- Next:PM556-TP-ETH, DC562, AX561, A0561 are ABB distributed automation PLCs.
Latest news
-
Perfect end to 2023. great start to 2024!
A perfect end to 2023! A great start to 2024! A new journey, a new chapter, a new challenge! Today, we welcome a brand new beginning.
-
Wuhan Xieyuan New Year's Day holiday notice in 2024
New Year's Day holiday: December 30, 2023 to January 1, 2024. Three days in total.
-
Notice on the arrangement of Mid-Autumn Festival, National Day holiday in 2023
In 2023, the holiday arrangement of Wuhan Xieyuan is as follows: September 29th (Friday) - October 6th (Friday), a total of 8 days off. Work on October 7th (Saturday) and October 8th (Sunday)
-
Notice of our company on Spring Festival holiday arrangement in 2023
Spring Festival holiday arrangement in 2023: January 19 (Thursday) to January 27 (Friday), a total of 9 days off. January 28 to start work!