GE Grid Solutions 369 motor management relay arrived.
Time: 2020年04月14日Multilin 369 Integrated protection and control for medium sized AC motors. Enhanced Thermal Model. Suitable for hazardous locations.
Designed for medium voltage motors, the 369 delivers simple setup configuration through the use of the Motor Settings Auto-Configurator, advanced graphical diagnostics with the Motor Health Report, comprehensive communications with multiple communication options and complete traceability of all setting changes with the Security Setting Change History Report, providing unparalleled motor protection for medium sized AC motors.
Key Benefits
Enhanced Thermal Model
Complete Asset monitoring
Enhanced reporting
Reduce troubleshooting time and maintenance costs
Multiple communication protocols
Simplified programming with the EnerVista™ 369 Motor Settings Auto-Configurator
Optional Conformal coating
Field upgradable settings and firmware
Suitable for hazardous locations
Installation flexibility
Safe and reliable motor re-start on “Down Hole” pump applications
User definable parameters and data size for DeviceNet polling
User definable parameters and data size for Profibus DPV1 cyclic data
Motor learned data on historical start characteristics
Applications
Protection and control for medium sized AC motors
“Down Hole” pump applications
Suitable for applications involving Variable Frequency Drives
Two Speed motor application
- Previous:Norgren pressure gauge 18-015-209 1/4" NPT thread arrived.
- Next:Pepperl+Fuchs voltage repeater KFD2-VR4-Ex1.26 arrived.
Latest news
-
Perfect end to 2023. great start to 2024!
A perfect end to 2023! A great start to 2024! A new journey, a new chapter, a new challenge! Today, we welcome a brand new beginning.
-
Wuhan Xieyuan New Year's Day holiday notice in 2024
New Year's Day holiday: December 30, 2023 to January 1, 2024. Three days in total.
-
Notice on the arrangement of Mid-Autumn Festival, National Day holiday in 2023
In 2023, the holiday arrangement of Wuhan Xieyuan is as follows: September 29th (Friday) - October 6th (Friday), a total of 8 days off. Work on October 7th (Saturday) and October 8th (Sunday)
-
Notice of our company on Spring Festival holiday arrangement in 2023
Spring Festival holiday arrangement in 2023: January 19 (Thursday) to January 27 (Friday), a total of 9 days off. January 28 to start work!